Although energy requires large amounts of water for its production, (inter)national statistics or reports on water demand for electricity for the African continent are scarce. Here we provide the spatially most detailed analysis presently available on freshwater demand for electricity for the recent year 2020, covering the whole of Africa. We conduct a major data mining effort using only freely accessible data. This results in 2534 individual power plants, including 1447 fossil (coal, oil and natural gas), 1071 renewable (wind, sun, biomass, geothermal and hydropower with the distinction between reservoir and run-of-river or ROR hydropower) and 16 other (waste heat and nuclear) power plants. We categorized the power plants according to applied fuel, operation cycle, infrastructure, cooling system and local climate. The total water withdrawal (WW) and consumption (WC) amount to 33 108 and 23 822 million m3 per year (Mm3 per year) respectively, for an annual electricity production of 1 050 674 GWh. Hydropower and natural gas, which have high water withdrawal intensities relative to other energy sources such as wind or sun, account for the largest fractions (70% and 27%, respectively) of total water withdrawal. Our database can be used at any spatial level, as we show results on the national, subnational and river basin level. Countries with high annual WW amounts include Egypt (8937 Mm3), Ghana (7893 Mm3), Zambia (5262 Mm3), Mozambique (2602 Mm3), Nigeria (2309 Mm3) and South Africa (1068 Mm3). River basins with high WW amounts include the Nile (10 377 Mm3), the Volta (7765 Mm3), the Zambezi (7596 Mm3) and the Niger (2562 Mm3) river basins. In major river basins, these WW amounts do not exceed 10% of renewable water availability, except for the Volta basin, where the value is 43%. By providing all results in a fully open-access database, we provide valuable statistics for any water management or energy stakeholder working in or on Africa.

Graphical abstract: Spatially distributed freshwater demand for electricity in Africa

Supplementary files

Article information

Article type
Paper
Submitted
27 Mar 2024
Accepted
27 May 2024
First published
31 May 2024
This article is Open Access
Creative Commons BY-NC license

Environ. Sci.: Water Res. Technol., 2024, Advance Article

Spatially distributed freshwater demand for electricity in Africa

P. W. Gerbens-Leenes, S. D. Vaca-Jiménez, B. Holmatov and D. Vanham, Environ. Sci.: Water Res. Technol., 2024, Advance Article , DOI: 10.1039/D4EW00246F

This article is licensed under a Creative Commons Attribution-NonCommercial 3.0 Unported Licence. You can use material from this article in other publications, without requesting further permission from the RSC, provided that the correct acknowledgement is given and it is not used for commercial purposes.

To request permission to reproduce material from this article in a commercial publication, please go to the Copyright Clearance Center request page.

If you are an author contributing to an RSC publication, you do not need to request permission provided correct acknowledgement is given.

If you are the author of this article, you do not need to request permission to reproduce figures and diagrams provided correct acknowledgement is given. If you want to reproduce the whole article in a third-party commercial publication (excluding your thesis/dissertation for which permission is not required) please go to the Copyright Clearance Center request page.

Read more about how to correctly acknowledge RSC content.

Social activity

Spotlight

Advertisements