Open Access Article
Tao Song
*a,
John F. Geisz
a,
Laurie-Lou Senaudb,
Lisa Champaultb,
Florent Sahli
b,
Jonas Geissbühlerb,
Bertrand-Paviet Salmonb,
Quentin Jeangrosb,
Jeremy Brewera,
Idris Davisa,
Rafell Williamsa,
Kaitlyn VanSanta and
Nikos Kopidakisa
aThe Materials, Chemical, and Computational Science Directorate, National Laboratory of the Rockies (NLR), Golden, Colorado 80401, USA. E-mail: tao.song@nrel.gov
bCentre suisse d'électronique et de microtechnique (CSEM), Rue Jaquet-Droz 1, CH-2002 Neuchâtel, Switzerland
First published on 2nd January 2026
Tandem solar cells are not limited to the conventional two-terminal (2-T) configuration. Multi-terminal designs like three-terminal (3-T) and four-terminal (4-T) devices have gained increasing attention in the PV community due to their relaxed current-matching requirement between subcells and their potential for enhanced energy yield. However, reliable and standardized methods for evaluating the performance of multi-terminal tandems remain underdeveloped. This work addresses this gap by providing comprehensive measurement guidelines tailored to these advanced configurations. We examine key coupling mechanisms between subcells, including the shared electrical load in 3-T devices and optical luminescent coupling in both 3-T and 4-T devices, to enable accurate and consistent performance evaluation. Furthermore, we propose two stabilized measurement methods for emerging 3-T tandem cells incorporating perovskite subcells: (1) a two-dimensional maximum-power-point tracking (MPPT) approach that continuously tracks both subcells' maximum power points (PMAX) until convergence to stabilized outputs, and (2) a hybrid approach that combines MPPT for one subcell with stabilized current recording under fixed voltage biases near the PMAX of the other, allowing robust extraction of the overall stabilized PMAX (termed “MPPT + asymptotic PMAX scan” method). These methods directly address the dynamic current responses inherent to perovskite-containing tandems, providing a foundation for meaningful and reproducible performance comparisons.
Broader contextTandem solar cells are rapidly pushing photovoltaic efficiency limits, with perovskite/Si tandems now surpassing 35% in certified performance. Although most research focuses on monolithic two-terminal designs, multi-terminal (3-T and 4-T) configurations are gaining attention due to relaxed current-matching constraints, higher energy yield, and compatibility with scalable manufacturing. Yet, reliable and standardized performance-measurement practices for these architectures remain underdeveloped, hindering meaningful comparison and slowing technology translation. This work addresses that need by presenting the first comprehensive, experimentally validated measurement framework for emerging multi-terminal tandems. It spans EQE measurement and spectral tuning to ensure junction-by-junction current balance; synchronized and sequential I–V methods that correctly handle electrical and optical coupling; and two steady-state strategies capable of reliably characterizing perovskite-containing tandems: a two-dimensional MPPT method and a hybrid MPPT plus asymptotic PMAX scan approach. We demonstrate the equivalence and throughput trade-offs between methods and highlight how to avoid common pitfalls (e.g., inflated 4-T efficiencies when the top cell is left at open circuit). By enabling accurate, reproducible, and comparable measurements across diverse 3-T and 4-T structures, this work strengthens the metrology foundation needed for future IEC/ASTM-style standards and supports the advancement of emerging tandem technologies toward industrial deployment. |
However, the performance evaluation of multi-terminal tandem cells introduces additional complexities compared to their monolithic 2-T counterparts. The extra terminals expand the number of variables that must be carefully controlled during electrical performance testing to ensure the results accurately reflect the real-world field conditions. For example, in 4-T cells, a prominent luminescent coupling effect13,14 from the top subcell may cause an overestimation of the bottom subcell's performance. If the top subcell's terminals are left improperly constrained (e.g., left at open circuit rather than operating at PMAX condition), the performance of the bottom subcell would be overestimated due to the luminescent photocurrent generated from the top cell. Additionally, in 3-T tandem cells, coupling from shared internal resistances can significantly affect device performance measurements if one terminal is left floating or if simultaneous multi-terminal scans are not performed. Geisz et al.15 systematically analysed the relationship between measurement loads and device variables in a prototype all-III–V 3-T tandem cell, highlighting these complexities. The more recent addition of perovskite subcells to 3-T and 4-T architectures11 introduced the additional complexity of the well-known slow response to an applied voltage,16,17 which needs to be considered when defining the measurement protocol.
From a testing lab perspective, this paper aims to establish a generalized measurement framework applicable across various types of multi-terminal tandem architectures. We focus on measurement setups that (a) make the process more accessible for researchers and (b) address the additional challenges posed by dynamic current responses in emerging perovskite-based devices. By standardizing performance characterization practices, we seek to enhance measurement accuracy, reproducibility, and comparability, thereby accelerating innovation and deployment of multi-terminal tandem technologies.
The photocurrent of the DUT is expressed as:
![]() | (1) |
![]() | (2) |
![]() | (3) |
![]() | (4) |
To further simplify spectrum optimization, we employ the junction current ratio between junctions i and j:20
![]() | (5) |
This spectrum tuning methodology developed for 2-T measurements is also applicable for both 3-T and 4-T tandem devices. However, it is worth noting a key distinction between the two configurations: in 3-T tandems, the two subcells are electrically coupled whereas in 4-T tandems they are electrically independent. Thus, test operators can measure each subcell (junction) sequentially in 4-T tandems, similar to single-junction cells, while controlling the operating condition of the other subcell. If spectrum tuning and/or a multi-source simulator is unavailable, only the simulator's total irradiance can be adjusted to meet STC requirements, not the wavelength-specific spectral shape. This limitation introduces an error that depends on the magnitude of the luminescent coupling (will be discussed later).
As shown in eqn (3)–(5), the spectral responsivity or equivalently the external quantum efficiency (EQE) of each subcell must first be determined to calculate Mi and Rij during the spectral tuning process. Unlike 2-T tandems, the extra terminals in 3-T and 4-T devices enable direct measurement of each subcell's EQE. A critical caveat, however, is ensuring all terminals are properly loaded to avoid measurement artifacts. For example, in a 4-T tandem with strong luminescent coupling in the top subcell, the two leads of the top subcell should be either shorted or held at the PMAX condition with an appropriate load resistor when measuring the EQE of the bottom subcell. This aspect will be further discussed in section 3.2.
In a 3-T device, the EQEs of both subcells can also be measured separately. For instance, in a 3-T series-connected perovskite/interdigitated-back-contact (IBC) Si tandem, the top cell EQE can be measured by contacting the top perovskite lead and the extra lead (called “Z” hereafter to be consistent with previously defined terminology,27 note this terminal “Z” is different from the current matching factor Zi of eqn (2)) from the Si subcell sharing the same polarity as the top perovskite lead. The bottom Si cell EQE can be measured directly from its own contact leads. If luminescent coupling is present, the floating lead can be either shorted with the extra Z lead or connected to a resistor load at the PMAX condition as described above.
Additionally, the EQEs of multi-terminal tandems can be characterized in a 2-T configuration. In such cases, proper light and voltage biasing must be applied to ensure that the subcell under test is current-limiting with minimal leakage current, thereby allowing reliable EQE extraction. A detailed methodology for measuring 2-T tandem devices is provided in previous work.17
It is also important to emphasize that the DUT temperature must be maintained at STC (25 ± 1 °C) during both EQE measurements and the subsequent electrical performance testing to ensure reliable performance benchmarking, as device parameters are sensitive to temperature variations.16 Under continuous illumination, stable temperature control can be achieved using a thermoelectric-controlled temperature-stage and/or chilled air circulation, together with a surface-mounted temperature sensor for real-time monitoring. All the measurements should be performed only after the DUT temperature has stabilized at 25 °C.
The electrical performance of PV devices can most simply be measured by biasing the terminals with a variable load (e.g., programmable power supplies, resistor loads) while monitoring current through a precision resistor with a four-wire connection setup. In research laboratories, I–V sweeps are generally performed using a more versatile instrument, a source-measurement unit (SMU) which combines these functions above. Note that these conventional I–V scans have a predetermined, fixed voltage scan rate (typically 50–200 mV s−1), and do not measure the steady-state performance for slow-responding PV devices (will be discussed in section 3.3). In the following discussion, we use SMUs to illustrate how electrical performance measurements are carried out on the multi-terminal tandem cells. Fig. 1 shows the two primary I–V measurement approaches for 3-T and 4-T tandems: (a) synchronized scans that require two separate SMUs, and (b) sequential scans using only one SMU. Note that synchronized scans can also be performed with a dual-channel SMU, which integrates two SMUs in one instrument case.6
In general, both 3-T and 4-T tandem cells should be characterized using synchronized measurements, meaning all electrical conditions are set and measured simultaneously with two SMUs (A and B). For instance, SMU A and B can be configurated to systematically source voltages VA and VB at the corresponding terminals of the cell under test, while simultaneously measuring the resulting currents IA and IB. Note that the synchronized voltage and current measurements are essential as the subcells' output are coupled in 3-T and 4-T tandems. The total tandem power at any given time can be expressed as:
| Ptotal(t) = PA(VA, VB, t) + PB(VA, VB, t) = IA(VA, VB, t)·VA(t) + IB(VA, VB, t)·VB(t) | (6) |
In some situations, the nature of the subcell coupling or time-stability can result in simplification of this equation, and thus, the required measurement procedures. For example, the time dependence can be removed if the DUT is time-stable, such as III–V tandems which do not show dynamic current response to voltage bias. In the following sections, we discuss in detail the measurement techniques for 3-T and 4-T tandem cells, as well as the more complex multi-terminal tandems containing perovskite subcells which exhibit dynamic current response. Note that schematics of the multi-terminal devices used in this work are provided in the supplementary material (Fig. S1), and detailed descriptions can be found in ref. 10, 11 and 15.
| IRo + IZo + ITo = 0 | (7) |
| VZT + VRZ + VTR = 0 | (8) |
Both electrical and optical coupling may be important for 3-T tandems. Optical coupling, also known as luminescent coupling (LC), occurs when light is emitted from the top subcell and reabsorbed in the bottom subcell as photocurrent, thus changing IB in eqn (6). Typically, optical coupling only transfers current from the top to bottom subcells, since light emitted from the bottom subcell is usually at a lower energy than the top subcell's bandgap, therefore the top subcell is transparent to this low-energy light. Electrical coupling occurs when current flow through a common resistance causing a voltage drop on both subcells as pictured in Fig. 1a left. Electrical coupling causes the operating point of each subcell to influence the performance of the other. In the case of time-stable PV materials such as III–Vs or silicon, eqn (6) simplifies to
| Ptotal(t) = IA(VA, VB)·VA + IB(VA, VB)·VB | (9) |
Fig. 2 shows the 2-D power contour plot of a series-connected GaInP/GaAs 3-T cell with a device size of around 5 mm × 5 mm, featuring an “n-on-p” polarity in both subcells,15 plotted as a function of two load voltages (i.e., P – VA,TZ – VB,RZ) measured under the common-Z (CZ) mode. This contour is constructed from data points obtained through two synchronized conventional I–V scans, with both voltage variables sourced simultaneously. Negative power values are excluded from the plot, since they correspond to power consumption rather than generation—an operating regime irrelevant for solar cells. As expressed in eqn (9), each power point in the contour depends on the two sourcing voltages from the SMUs; thus, precise synchronization of voltage sourcing and current measurement is essential to accurately capture the full electrical and optical coupling mechanisms of the DUT.
In practice, synchronized I–V scans must occur concurrently to obtain the corresponding VA, IA, VB, and IB. Several approaches can be employed to conduct such synchronization. One option is to program the two SMUs to simultaneously source two voltages VA and VB at the corresponding terminals (VTZ and VRZ in Fig. 2), measure the resulting voltages and currents, and traverse the entire voltage matrix with a predefined step size to generate the full power mapping. Alternatively, one can hold VB constant while sweeping VA across its full range, recording measured IA, VA, IB, and VB simultaneous at each step via hardware triggering, and then repeat this process for successive values of VB. This work adopts the latter approach, which produces the power mapping shown in Fig. 2.
Although the electrical coupling is negligible in 4-T tandems due to the high resistance that separates the two subcells, optical coupling through luminescence can still occur, boosting the photocurrent of the bottom subcell under test depending on the operating conditions of the top subcell. For instance, the EQE of the bottom Si subcell of a GaAs/Si 4-T cell10 (Fig. 3a) shows a prominent QE tail at short wavelengths (red dashed line) when the top GaAs subcell operates under open circuit conditions. Likewise, Fig. 3b highlights this effect in the I–V measurements, where the short-circuit current (ISC) of the bottom Si cell is artificially boosted from 11.5 mA to 15.8 mA due to the luminescence from the top cell at open-circuit condition. As mentioned previously, when the subcell bandgaps decrease through the tandem, optical coupling is not bidirectional, so for highly stable PV materials eqn (6) reduces to
| Ptotal(t) = IA(VA)·VA + IB(VA, VB)·VB | (10) |
Consequently, the performance of the top subcell can be characterized with a single SMU first, irrespective of the conditions of the bottom subcells. However, the performance of the bottom subcell should be characterized with a single SMU while the conditions of the top subcell are constrained to the maximum power point of the top subcell previously measured using a simple load resistor as shown in Fig. 1b. The sum of these two maximum powers is the performance of the tandem when both subcells operate at their respective VMAX conditions.
As shown in Fig. 3b, when measuring the independent performance of each subcell in a 4-T tandem, it is crucial to first measure the top subcell to determine the top subcell PMAX conditions to use while measuring the bottom subcell. Otherwise, it could lead to inflated total cell efficiency values (dashed curves in Fig. 3b).
Alternatively, the performance of a 4-T tandem can be measured using two synchronized SMU loads, similar to the approach for 3-T cells in section 3.1. This will give the same maximum power results as the simplified sequential I–V scan method, but will also capture the off-peak operating conditions of the 4-T tandem. Fig. 4 illustrates the power contour plot of a mechanically-stacked GaAs/Si 4-T cell as a function of VA,GaAs and VB,Si. As shown in the insert table, the peak power of 20.98 mW from the contour plot agrees closely (i.e., within less than 0.2%, well below the measurement error of ∼1.0%) with the combined total power (21.03 mW) obtained from the sequential I–V scans (shown in Fig. S2 in the supplemental file), in which both subcells operate at their respective PMAX conditions.
This confirms that the two measurement approaches are effectively equivalent for determining device performance. However, a key drawback of the synchronized scan is its significantly lower measurement throughput: the matrix of I–V arrays requires more than 30 minutes to complete in this case, compared to less than one minute for the sequential I–V scans.
To accurately capture the dynamic behaviour of such slow-responding multi-terminal tandems, time must be introduced as an additional variable alongside the two load voltages, as expressed in eqn (6). In this case, stability of the measured quantity (current, power) over time is evaluated with the goal of reaching a steady-state (or stabilized) value. For meaningful performance comparisons, steady-state measurement methods already widely used for 2-T solar cells such as asymptotic I–V scan16 and maximum power point tracking (MPPT),29 can be adapted for 3-T and 4-T perovskite-based tandem configurations as discussed in the following.
For 3-T perovskite-based tandem cells, we propose two steady-state performance measurement methods that directly address their dynamic current response:
(1) Two-dimensional MPPT. This method continuously tracks both subcells' PMAX by applying a “perturb-and-observe” algorithm to each subcell in a stepwise manner. This process is repeated until both subcells converge to stabilized PMAX outputs (further details in section 3.3.1).
(2) Hybrid “MPPT + asymptotic PMAX scan”. In this approach, MPPT is only applied to one subcell while the other subcell is held at a fixed voltage bias near its VMAX, with its current monitored until stabilization. This process is repeated across a range of voltage biases near the second subcell's VMAX. Finally, the DUT's overall PMAX is extracted by combining the stabilized PMAX values of both subcells through polynomial fitting (further details in section 3.3.2).
We demonstrate both methods on an encapsulated perovskite/IBC Si 3-T tandem cell with an active area of approximately 4 cm2. The cell was fabricated at CSEM following the protocol described in a previous publication.11 In brief, the device consists of a p-i-n perovskite top cell grown directly on an n-type silicon heterojunction IBC bottom cell. Seven tandem cells, each measuring 4 cm2, were produced on a 4-inch Si wafer and then separated by laser scribing. The busbars of the subcells were connected using ribbons, and the cells were encapsulated in a glass/glass package with lamination foils and an edge sealant.
The algorithm first perturbs the top perovskite subcell's voltage bias VA(TZ,PVSK) by a predefined increment ΔVA and records the corresponding change in output power, ΔPA, while keeping the bottom Si subcell at its initial bias voltage. If ΔPA > 0, the perturbation continues in the same direction; if ΔPA < 0, the sign of ΔVA is reversed. The same process is then applied to the bottom Si subcell to determine its next voltage bias VB(ZR,Si) while keeping the top perovskite subcell at its corresponding perturbed voltage bias. This iteration is repeated in a stepwise manner with this algorithm until both subcells converge to their stabilized PMAX values (Fig. 6b), corresponding to the converged voltage perturbations shown in the insert of Fig. 6a.
To accommodate the slow response of the perovskite subcell, a 1 second delay is introduced between each voltage bias change, allowing the current to settle before the next voltage is applied.29 Following the stabilization criterion used for 2-T perovskite devices,29 we consider the power stabilized when it changes by <0.1%/min for at least 30 s after a minimum measurement time of 5 minutes. The device's total rated power is then obtained by averaging over the last 30 s (grey region in Fig. 6b).
While each VZR,Si is held constant by SMU A and its measured current is recorded, an MPPT tracking process is simultaneously executed on the perovskite subcell using SMU B, following the same “perturb-and-observe” algorithm described in section 3.3.1. Each iteration continues until both stabilized PTZ,PVSK and PZR,Si are achieved. The process is then repeated at the next VZR,Si bias point, stepping through all selected voltage across the Si subcell's VMAX range.
Fig. 7a and b show the evolution of subcell powers as a function of time under this hybrid scan process: the blue data points in Fig. 7a represent PTZ,PVSK tracked by MPPT at different VZR,Si biases, while the yellow–green–purple data points in Fig. 7b illustrate the asymptotic behaviour of PZR,Si at the same VZR,Si biases near its VMAX. Note that the dynamic current variations in the perovskite subcell are reflected in the bottom Si as they are coupled. Fig. 7c provides a closer snapshot of both subcells' power stabilization at one of the biases, VZR,Si = 0.546 V.
At each VZR,Si bias point, the stabilization criterion requires that the power of both subcells change by <0.1%/min for at least 30 s after a minimum measurement time of 1 minute (grey area in Fig. 7c). Fig. 7d compiles all averaged power points meeting this criterion for both subcells, along with corresponding total power as a function of VZR,Si. Finally, a polynomial fit is applied to this dataset to determine the overall PMAX of the 3-T tandem cell.
In terms of measurement throughput, 2-D MPPT (∼6 min) is faster than the hybrid approach (∼20 min), since it actively tracks both subcells' PMAX in parallel. Both methods, however, are more efficient than synchronized conventional I–V scans, which require sweeping the entire voltage ranges of both subcells (e.g., in our lab, the voltage range for each subcell is −0.05 × VOC to 1.03 × VOC depending on their VOC values). For example, a conventional I–V scan typically involves ∼200 points per subcell, each with a 100 ms delay. A synchronized 2-D I–V scan would thus require 200 × 200 × 0.1 s = 4000 s, i.e., more than 1 hour.
More importantly, synchronized I–V scans cannot accurately capture the dynamic behaviour of slow-responding subcells, leading to potential measurement inaccuracies in the extracted performance metrics. By contrast, both steady-state methods overcome this limitation by allowing each subcell to reach equilibrium before recording power data, providing a more accurate representation of true operating performance. For example, the stabilized PMAX of the perovskite/Si 3T device in Fig. 5 obtained from the hybrid method is 34.94 mW–higher than both the synchronized forward (33.06 mW) and reverse (34.85 mW) fast I–V sweeps. Conversely, for the perovskite/Si 3T cell in Fig. 6, the stabilized PMAX (98.76 mW) is lower than its synchronized forward (99.61 mW) and reverse (99.29 mW) fast I–V sweeps, further illustrating the strong dependence of fast results on scan direction and measurement conditions.
Taken together, these results demonstrate that the two steady-state performance measurement methods not only enable reliable measurement of slow-responding tandems but can also be generalized to conventional 3-T tandems. If these approaches are available in a testing lab, they can offer both improved measurement reliability and substantially higher throughput.
For 4-T tandems containing a slow-responding subcell (e.g., perovskite), the process is simpler than for 3-T devices, as the subcells can be measured sequentially (see section 3.2). The only adjustment required is to apply a steady-state method (MPPT or asymptotic PMAX scan) to the slow-responding subcell.
![]() | ||
| Fig. 8 Performance measurement framework of 3-T and 4-T tandem solar cells including devices containing slow-responding subcells. | ||
For 3-T tandems, synchronized I–V scans can be employed when both subcells exhibit fast response. If a slow-responding subcell is present (e.g., perovskite), steady-state methods are required. Two options are proposed: (i) two-dimensional MPPT, which continuously tracks the power maxima of both subcells, or (ii) a hybrid method combining MPPT on one subcell with an asymptotic stabilized PMAX scan on the other. Both approaches yield equivalent results but differ in measurement time.
For 4-T tandems, two I–V measurement approaches are possible: synchronized scans with spectrum adjustment or sequential scans with individual irradiance adjustment for each subcell. When slow-responding subcells are involved, they must be measured using steady-state methods, while fast-response subcells can be characterized with conventional I–V scans. In cases where luminescent coupling exists between subcells, the non-tested subcell must be held at its PMAX using a proper load resistor to ensure accurate determination of the combined output.
It is important to note that not all research laboratories have access to spectrum-tuning hardware or synchronized scan capabilities. These limitations can introduce non-trivial measurable errors. For example, if separate I–V scans are used instead of synchronized scans for the perovskite/IBC-Si 3-T device in Fig. 6, the extracted PMAX can be overestimated by approximately 5% (103.59 mW from sequential forward scans vs. 98.76 mW from the 2-D MPPT method). As discussed in our previous work,17 the absence of spectral tuning can similarly introduce significant measurement errors in tandem measurements. In situations where such capabilities are unavailable, results should be interpreted with caution:
(a) For record-seeking or accurate baseline measurements, spectrum tuning and synchronized steady-state performance methods are essential, and third-party evaluation by accredited testing labs is still highly recommended.
(b) For research and development stage measurements, simpler protocols–such as looser irradiance adjustment or non-synchronized I–V scans–may be used, but measurement limitations and potential sources of error should be clearly documented and reported.
Overall, this framework provides a clear strategy for adapting measurement methods to device architecture (3-T vs. 4-T), dynamic behaviour (fast vs. slow response), and optical interactions (presence of luminescent coupling), ensuring both accuracy and productivity in tandem solar cell characterization.
Supplementary information (SI): schematic diagrams of the three types of multi-terminal tandem cells investigated in this work, as well as representative light I–V curves of a GaAs/IBC Si 4-T device used in Fig. 4 measured using sequential fast I–V scans. The three tandem architectures studied are: (i) an epitaxially grown GaInP/GaAs 3-T cell, (ii) a mechanically stacked GaAs/IBC Si 4-T cell, and (iii) a perovskite/IBC Si 3-T cell. See DOI: https://doi.org/10.1039/d5el00195a.
| This journal is © The Royal Society of Chemistry 2026 |