Lucie
McGovern
*ab,
Erik Christian
Garnett
ab,
Sjoerd
Veenstra
c and
Bob
van der Zwaan
ade
aUniversity of Amsterdam, Faculty of Science (HIMS, IOP and/or IAS), Amsterdam, The Netherlands. E-mail: lucie.mcgovern@free.fr
bAMOLF, Center for Nanophotonics, Amsterdam, The Netherlands
cTNO Solar Energy, Partner in Solliance, Eindhoven, The Netherlands. E-mail: sjoerd.veenstra@tno.nl
dTNO Energy Transition Studies, Amsterdam, The Netherlands
eJohns Hopkins University, School of Advanced International Studies (SAIS), Bologna, Italy
First published on 26th September 2023
Perovskite solar cells have shown considerable developments in the last decade, and commercial applications are drawing closer. In this article, we present a techno-economic study of perovskite PV technologies. We compare published data on manufacturing costs of single-junction perovskite modules and find that they are dependent on the module design (rigid or flexible) and vary from 10 to almost 100 € per m2. We calculate the LCOE as a function of module efficiency and stability for a set of four module cost scenarios at 12.5, 25, 50, and 100 € per m2. The resulting LCOE varies from 4.3 to 25.5 ct kW−1 h−1 and shows low potential for immediate competition with crystalline silicon PV in the utility sector. Perovskite PV's competitive advantage lies in both lighter and less rigid modules, and in the development of tandem modules together with silicon. We hence extend the LCOE equation to highlight the benefit of producing flexible low-weight modules by roll-to-roll manufacturing, and modify the LCOE maps to showcase the benefits of tandem modules. Based on learning curve analyses applied to the CAPEX of single-junction and tandem modules, we develop three scenarios for the evolution of the LCOE of perovskite modules from 2025 to 2050. Under the optimistic scenarios, we find that the LCOE could reduce to 2.8 ct kW−1 h−1 by 2050.
Perovskite solar cells have gained a large momentum in this regard, with claims of rapid commercial applications from industrial companies.4–7 The appeal of perovskite cells stems from the combination of high lab efficiencies – with a record of 26% power conversion efficiency (PCE) in 2023 (ref. 8) – cheap material costs, and a wide choice in terms of fabrication techniques, including slot die coating,9 gravure printing10 and thermal evaporation.11 Many of these fabrication techniques are compatible with roll-to-roll manufacturing,12 which is especially beneficial in terms of production throughput. Moreover, the perovskite material is deposited on flexible and light-weight substrates,12 contrary to c-Si wafer processing,13 which produces rigid and heavier modules. Roll-to-roll manufacturing therefore extends the scope of applicability of the newly manufactured modules towards emerging and expanding PV sectors, such as indoor PV and building-integrated PV (BIPV).7,14
The development of tandem modules – where a perovskite top cell is deposited on top of a silicon bottom cell – represents another promising integration route for perovskite materials in PV. The silicon bottom cell imposes a rigid design to the whole module, but the higher maximal PCE of these perovskite–silicon (per–Si) tandem modules is beneficial for the overall cost of solar energy.15
If perovskite materials might therefore be ideal candidates for the next generation of solar modules, both single-junction (SJ) and tandem modules are still under development, with several key unknowns remaining. Indeed, properties such as scalability of small lab cells towards larger-scale modules16 and long-term stability17 are still active topics of research. Even the general perovskite module architecture, from mesoporous to planar n–i–p,18 through inverted p–i–n19 and HTM-free20 designs, is still a matter of debate;21 and tandem modules are not immune to this interrogation, as they can adopt a variety of device architectures, including 2-terminal (2T), 3T or 4T configurations.22 These uncertainties in terms of scalability, stability and device architecture make it hard to pinpoint the possible future contributions of these new technologies to the PV sector. With the present work, we aim to answer the following questions: what are the conditions for SJ perovskite and per–Si tandem modules to become competitive with, or even out-compete, c-Si PV in the utility sector? How can roll-to-roll manufacturing contribute to the development of perovskite PV? Which cost reductions can be expected in the future?
To answer our set of questions, we perform a new techno-economic analysis of perovskite PV. We first look at the module cost estimates as established in the literature and highlight the key factors affecting this cost. In a second step, we calculate the LCOE for SJ perovskite modules, considering a wide range of module efficiencies, degradation rates, and manufacturing costs. To take into account the lightness of perovskite modules fabricated by roll-to-roll manufacturing, we propose a modified LCOE equation, with reduced CAPEX. We then extend our LCOE analysis of perovskite materials to tandem modules, and compare the relative benefits between these and the SJ perovskite modules. Finally, we perform learning curve analyses on the CAPEX of both SJ perovskite and per–Si modules, and propose three LCOE scenarios, from conservative to optimistic, for the period 2025–2050.
![]() | ||
Fig. 1 Literature review of manufacturing costs for SJ perovskite solar modules, as calculated in the techno-economic analyses from ref. 23–33. When Balance Of Module (BOM) costs are not included in the calculations,23,25,31 the boxes are presented with a hashed shading. |
The most striking observation lies in the spread of calculated cost, with an order of magnitude difference between the lowest and the highest estimate, from 10 € per m2 (in Pourjafari et al.25) to almost 100 € per m2 (in Mathews et al.30). A thorough perovskite LCOE calculation should therefore consider the breadth of possible manufacturing costs in order to accurately report the corresponding possible range of LCOE values. We alert for an important caveat in attempts to compare cost values from literature that derive from different methodologies. For instance, the calculations by Cai et al.,23 Martin et al.31 and Pourjafari et al.25 omit the costs of encapsulation, framing, and addition of a junction box to the modules – the so-called balance of module (BOM).26 The module costs resulting from these three studies are therefore presented with a hashed shading in Fig. 1, and are not taken into consideration for the remainder of our manufacturing cost analysis.
As shown in Fig. 1, the total manufacturing costs can be decomposed into 3 main categories: material costs, OPEX and CAPEX. We observe that the main contribution in all calculations comes from material costs, which represents at least 50% of the total costs and can increase to up to 85%, while OPEX and CAPEX play a smaller role in the overall costs. Taken together, OPEX, CAPEX and “other” costs amount to a total of 6.5 to 30 € per m2; their spread is low in comparison to that of the material costs. A deeper analysis into the composition of material costs reveals that these are driven neither by the perovskite layer nor the electron or hole transport layers, as one might expect, but primarily by the BOM materials, specifically the front substrate, the encapsulation scheme, and the junction box.26,30,33,34
The spread in calculated manufacturing costs could be a consequence of the different assumptions made in each of the literature references. The manufacturing capacity, which is a factory's maximum production capability, has, for instance, been shown to be determinant in this regard.26,30–32 To study this effect, in Fig. 2a we plot the calculated manufacturing cost as function of the annual production capacity. Most calculations are made with a 100 MWp per year capacity assumption,24,26–28,30,32,33 with only a few reports using 1 GWp per year capacity assumption or higher.29,30 We find that the median cost is close to 55 € per m2 for a 100 MWp per year production capacity and decreases to 22 € per m2 with a 1 GWp per year production capacity. This is a reflection of two combined effects: a productivity increase and an economy-of-scale. When the production throughput of a plant increases, if the CAPEX and OPEX remain equivalent, the plant becomes more productive and the cost per module is reduced. Regarding the economy-of-scale, the costs of materials are typically observed to be dependent on the quantities purchased, that is material costs are a function of the production capacity. This phenomenon is explicitly accounted for in some of the calculations in our literature review.30–32 Overall, the manufacturing cost thus decreases with a higher production capacity, which makes this factor a key leverage for reducing manufacturing costs.
![]() | ||
Fig. 2 Perovskite module cost as function of (a) annual production capacity of the manufacturing plant, (b) module design type (rigid or flexible) and (c) publication year of the calculation. |
No techno-economic study so far has looked specifically at a comparison between rigid and flexible modules, i.e. the difference between modules prepared on glass substrates and those prepared on flexible substrates, such as in roll-to-roll manufacturing. To study whether this design feature of the module has an effect on the perovskite manufacturing cost, in Fig. 2b we plot the manufacturing cost as function of the module design type. We find that the manufacturing cost typically increases by a factor 75% for flexible modules in comparison to rigid modules, with 70 € per m2versus 40 € per m2 for the latter. This result is not or hardly impacted by the production capacity of the modules (at least not within the production capacity assumptions considered here), since 80% of the datapoints for both rigid and flexible modules refer to an annual production capacity of 100 MWp per year. Our findings could, however, be influenced by the publication year of the study, as we observe a slightly higher fraction of flexible module calculations being older than the rigid module calculations (60% versus 40%). Later publication years indeed lead to somewhat lower estimates for the manufacturing cost, as shown in Fig. 2c. However, the trend observed here cannot be explained solely by this effect, and we speculate that the additional costs for the flexible foil and the encapsulation scheme are among the main drivers for the resulting cost difference. Our literature review thus suggests a correlation between module type and overall manufacturing cost for perovskite modules, though more calculations are needed to confirm and refine this hypothesis. Further analysis of the data reported in this literature review (relative to the manufacturing plant location) is provided in Section 2 of the ESI.†
We want to calculate the LCOE for perovskite solar modules in the utility sector, with the goal of comparing it to the LCOE of c-Si modules. As established in the previous section, the range of estimates for the perovskite manufacturing cost remains broad. We thus choose four relevant scenarios for the module cost in order to represent the full scope of module cost variability: 12.5, 25, 50 and 100 € per m2. The lower boundary of 12.5 € per m2 is less than the realistic current module cost29 (at 18 € per m2) when all costs are included, but it allows us to visualize the benefits of an ideal low-cost scenario. Apart from the module cost, the LCOE is also dependent on the module efficiency and stability. Since the final specifications of commercial perovskite modules are still unknown, we treat both the efficiency and stability as input parameters, which we vary in order to calculate maps of the LCOE. Regarding the efficiency, the current record for perovskite cells prepared by roll-to-roll manufacturing is 16.7%.39 This value has grown thanks to continuous research efforts,40–42 but still remains below the record for spin-coated rigid cells, currently at 26%.43 These record performances are obtained on a cell level and with aperture areas below 1 cm2, while the PCEs of complete modules are lower. In fact, the module PCE decreases with module size: the current record for modules larger than 19 cm2 is 21.8%,44 which decreases to 17.9%45 for cells larger than 800 cm2. To cover the full range of potential perovskite performance, we thus choose to vary the module PCE from 10 to 25% in our calculations. For the stability of perovskite modules, we fix the project duration of a solar power plant to 25 years and vary the ADR from values of 0 to 10%. The upper threshold is set at this exceptionally high value of 10% to represent the uncertainty regarding this parameter34,46 (see Section 3 of the ESI† for more detail, including an analysis of why a module replacement scheme doesn't provide any LCOE benefit).
To compare perovskite to c-Si PV under the same conditions, we keep the CAPEXBOS, OPEX, δ, PR and Irr values fixed. The OPEX and CAPEXBOS values for utility-scale PV are taken from IRENA,47 as well as the CAPEXmodule value for c-Si (see details in Section 4 of the ESI†), while the CAPEXmodule value for perovskite is divided into the four scenarios mentioned above. The δ is set to 5% for OECD countries47 and the PR is fixed at 85%.3,37 We set Irr to 1200 kW h per m2 per year, which is the average for global horizontal irradiance in Europe.48 Under these conditions, we calculate a LCOE of 6.3 ct kW−1 h−1 for c-Si PV, assuming 21% PCE3 and 0.5% ADR.49 This value is larger than the 4.1 ct kW−1 h−1 average for utility-scale LCOE world-wide,47 due to the lower irradiation conditions in Europe compared to the global average irradiation conditions for installed PV.
The resulting perovskite LCOE maps are shown in Fig. 3. The contours representing 5, 7.5, 10, 12.5, 15, 17.5, 20 and 22.5 ct kW−1 h−1 are represented by black dotted lines and the LCOE of c-Si PV is shown in red. Our first finding is that all three parameters, namely the module cost, degradation rate, and efficiency, clearly affect the overall LCOE. Only a careful selection of these three parameters will allow for competition against c-Si PV. When the perovskite module cost is as high as 100 € per m2, there is no possible competition with c-Si: the LCOE starts from 7 ct kW−1 h−1 for the high-efficiency, high-stability modules represented in the top left corner of the map, to almost 26 ct kW−1 h−1 for the modules with low-efficiency and low-stability in the bottom right corner of this map. To be able to compete with c-Si LCOE, the perovskite module cost must be equal to or below 50 € per m2, as represented by the c-Si LCOE line (in red) in the matching sub-plots. As expected, with lower module cost, the range of efficiency and stability values over which perovskite modules can compete with c-Si ones expands. With a 1% ADR, the minimal PCE for competition with c-Si decreases from 20% for perovskite modules at 50 € per m2 to 16% for modules at 25 € per m2 and 13% for modules at 12.5 € per m2. Alternatively, perovskite modules with 25% PCE and a 4.5% ADR can still be competitive with c-Si when the module cost is as low as 12.5 € per m2, a value which reduces to ADRs of 3.5% and 2% for module costs of 25 € per m2 and 50 € per m2, respectively. Globally, the minimum achievable LCOE under the present assumptions (i.e. for Irr = 1200 kW h per m2 per year) is 4.3 ct kW−1 h−1.
After exploring the combined effects of the variation in module cost, degradation rate, and efficiency in the perovskite LCOE maps, we come to the following conclusion: while competition with c-Si PV for the utility sector is possible when a combination of ambitious module cost, high efficiency and high stability is reached for perovskite modules, this set of conditions remains quite restrictive. Moreover, the relative benefit is rather low, and only represents a 2 ct kW−1 h−1 difference in the best scenario. Therefore, we do not foresee immediate competition against crystalline silicon PV in the utility sector. This result is in agreement with previous studies.
Here, we quantify the benefit of producing low weight perovskite modules by hypothesising that a change in the module weight might express itself as a reduction in the CAPEXBOS. Part of the CAPEXBOS is dependent on the area (hence on the PCE of the modules), e.g. for racking and mounting, where a higher module PCE will lead to lower BOS costs. The other part is dependent on the capacity of electricity delivered, e.g. for the inverter costs, where a larger amount of electricity produced will lead to a larger cost. Overall, the CAPEX thus depends on four parameters: the module cost, the module PCE, and the area-dependent and capacity-dependent terms of CAPEXBOS, expressed as CAPEXBOS(a) and CAPEXBOS(c):
The area-dependent contribution, CAPEXBOS(a), can be further decomposed into a term which depends only on the module area and not on the module weight, and a term which depends on both the module area and its weight. The table below sums up the different sub-categorisations considered.
CAPEXBOS | Area-dependent CAPEXBOS(a) | Capacity-dependent CAPEXBOS(c) |
---|---|---|
Not impacted by weight | - Electrical installation | - Inverter |
- DC cabling/wiring | - Grid connection | |
- Soft costs | - Soft costs | |
Impacted by weight | - Mounting/racking | |
- Mechanical installation |
We recalculate the LCOE of perovskite PV for light-weight modules by using a modified LCOE equation, which assumes a factor 10 decrease in the costs related to the weight-dependent term of CAPEXBOS(a), to illustrate both the potential lower hardware costs in terms of mounting and racking, and the lower mechanical installation costs – for instance with the reduction of labor force physically needed to install the modules. This large decrease factor is used to exemplify the maximal potential benefits for the production of light-weight solar modules within the utility sector (see Section 5 of the ESI† for more detail on this assumption). The results are shown in Fig. 4. In black dotted lines are the contours representing 5, 7.5, 10, 12.5, 15, 17.5, and 20 ct kW−1 h−1, while LCOE for c-Si PV is highlighted in red.
We obtain a similar set of LCOE maps, in which all three factors – module cost, efficiency and stability – have a role to play in the final perovskite LCOE. We do observe a distinction, however, with respect to the previous case: the LCOE is somewhat reduced and only reaches 23 ct kW−1 h−1 at most. This also means that the set of conditions for perovskite modules to compete with c-Si PV is less restrictive. Even with a high module cost of 100 € per m2, the perovskite modules could be competitive with c-Si based ones if they are 25% efficient and have less than 1% ADR. More realistically, at 25 € per m2 and with an ADR of 1%, the perovskite modules would remain competitive against c-Si ones as long as their PCE exceeds 12%. In fact, the sub-plot for modules costing 50 € per m2 is similar to the previous one for modules costing 25 € per m2 when no light-weight benefit is taken into consideration. In other words, the added value of lightness in these new roll-to-roll deposited modules contributes in reducing the constraint for making cheap modules. Alternatively, with a similar price, the constraints on efficiency and stability of the modules are reduced. Overall, under our modified LCOE equation and for the set of conditions considered here, we find that the LCOE can be reduced down to 3.7 ct kW−1 h−1, if the perovskite modules are cheap, efficient, and stable. Producing light-weight perovskite modules thus yields a non-negligible impact in terms of the techno-economic benefits of perovskite PV relative to c-Si PV. However, this maximal reduction potential remains limited relative to the 4.3 ct kW−1 h−1 obtained without any weight considerations, especially considering the advantageous one order of magnitude reduction in weight-dependent CAPEXBOS(a) used here. In other words, SJ perovskite PV shows limited potential for competition with c-Si PV, even with the additional weight-benefit of using a flexible substrate. We stress that these considerations are valid for the utility sector market, where c-Si PV has been widely established over the last decades, and highlight that perovskite SJ modules might instead unlock their full potential in the residential and industrial sectors, both directly on roof tops and in more intricate designs such as those developed for BIPV.53 Indeed, with e.g. an estimated 40% of houses in the Netherlands which cannot withhold the weight of traditional c-Si PV modules on their roofs, it becomes clear that light-weight perovskite PV might contribute to new PV markets inaccessible by c-Si PV. Research in SJ perovskite PV should therefore concentrate on these new range of applications which rely specifically on the modules being light and flexible, together with coordinated efforts on both scaling the PCEs obtained on rigid small cells to larger flexible modules and prolonging these modules' outdoors lifetime.
The initial PCEs are set at 12.5, 15, and 17.5% in the conservative, baseline and optimistic scenarios, and the initial costs are fixed to 100, 90, and 70 € per m2. Similar to analyses from the international technology roadmap for PV,62 we couple the learning curve model described above to a PCE performance advancement of the modules over time. With 0.2, 0.3, and 0.4% per year annual progress rate (APR) within the three respective scenarios, the modules will attain an overall PCE of 17.5, 22.5, and 27.5%63,64 in 2050. We couple the faster LR scenario together with higher CAGR, higher initial PCE, and higher PCE APR – and vice versa – to represent both the most and least optimistic possibilities, and therefore cover the full range of prospective costs for perovskite PV.
The resulting CAPEXmodule scenarios are shown in Fig. 5a, where we observe a significant reduction in cost over time: in the baseline scenario, these decrease from 600 € per kWp in 2025 to 175 € per kWp in 2050; in the optimistic scenario, from 400 to 85 € per kWp; and in the conservative scenario, from 800 to 320 € per kWp. Apart from the module cost, we have seen in the previous sections that the BOS costs can also have a clear impact on the LCOE. The learning curve model has been more often applied to the module costs than to the BOS costs; nonetheless, a recent study found a LR of 11% for the BOS costs in PV.65 We thus extend our learning curve analysis to also include the BOS, and develop three CAPEXBOS scenarios, with LRs of 5, 10, and 15%. As seen in Fig. 5b, the BOS cost reductions are smaller compared to the module cost reductions, which is a reflection of the lower LR for BOS. To quantify the potential cost impacts of producing lighter perovskite modules by roll-to-roll manufacturing, we also calculate the effect of a 10-fold reduction in the weight-dependent term of CAPEXBOS. The resulting three scenarios are shown in dashed lines. Compared to the scenarios without any weight consideration, there is a relative cost reduction in 2050, from 436 to 337 € per kWp in the conservative scenario, from 265 to 205 € per kWp in the baseline scenario, and from 157 to 122 € per kWp in the optimistic scenario.
As a last step, we use the CAPEX scenarios for both the modules and BOS depicted in Fig. 5a and b as input parameters, fix the δ and Et values, and calculate the corresponding LCOE. Specifically, we maintain δ at 5%, PR at 85% and Irr at 1200 kW h per m2 per year (as in the LCOE maps shown previously in Fig. 3 and 4) and we vary the OPEX and ADR values as a function of the scenario chosen. The OPEX is set at 10, 15, and 20 € per kWp per year, and the ADR is set to 1%, 2% or 3%; respectively in the optimistic, baseline and conservative cases. The resulting LCOE scenarios are shown in Fig. 5c. In the baseline scenario, the LCOE decreases from 10 to 5.3 ct kW−1 h−1 between 2025 and 2050; in the optimistic scenario, from 6.5 to 2.8 ct kW−1 h−1; and in the conservative scenario, from 15 to 9.1 ct kW−1 h−1. The cost reduction between 2025 and 2050 is thus considerable across all scenarios. We also calculate the three LCOE scenarios when replacing the CAPEXBOS input parameters by their low-weight equivalents: the impact is stronger for the more conservative scenario, and also more noticeable in early years, but relatively small in 2050 in the other two scenarios. In general, the reduction in LCOE is promising for the future of perovskite PV, where both the baseline and optimistic scenarios lead to lower LCOEs than that of c-Si PV today, with 5.3 and 2.8 ct kW−1 h−1 in 2050. Assuming constant LCOE for c-Si PV, the year in which the LCOE of perovskite modules would become equal to the LCOE of c-Si modules is 2039 for the baseline scenario and 2026 for the optimistic scenario, reduced respectively to 2035 and 2025 if light-weight considerations are taken into account. In other words, modules showing 17.5% PCE together with a cost of 70 € per m2, an ADR of 1% and a 10-times decrease in weight-dependent BOS costs, would already be cost-competitive with c-Si PV as early as 2025, with no need for any further LR and PCE improvements. As we do expect c-Si PV to evolve and its LCOE to reduce, we come to the conclusion that it is under the assumptions made in the optimistic scenario that perovskite PV shows the highest opportunity for a competitive advantage against c-Si PV. Finally, we note that the range of LCOE values explored here is calculated under a European irradiation average of 1200 kW h per m2 per year. The effects of higher and lower irradiation levels are explored in Section 6 of the ESI.†
The tandem LCOE maps in Fig. 6 show a range of performance values for competition with c-Si PV, across all four modules cost scenarios. To obtain the best cost difference, tandem modules should have a significantly higher PCE than SJ perovskite modules: from 20% PCE for tandem modules at 62.5 and 75 € per m2, to 27% for tandem modules at 100 € per m2 and even 35% for tandem modules at 150 € per m2. The stability requirements are also stronger than in the case of light-weight perovskite modules, with maximum ADRs of 4.4, 3.8, 2.6, and 1.2%, respectively, for the four module costs considered here.
In general, the comparison between per–Si tandem PV and perovskite SJ PV shows similar potential LCOE benefits against c-Si PV in the highest performance regime (with ambitious module cost, high performance and high stability). On the other hand, tandem PV holds a better position than perovskite SJ PV against c-Si PV in the lowest performance regime – the LCOE maximum for tandems is 18 ct kW−1 h−1 compared to 25.5 and 23 ct kW−1 h−1 for the classic and light-weight perovskite modules, as shown respectively in Fig. 6, 3 and 4. Nonetheless, the lowest achievable LCOE in Fig. 6 (under the assumptions considered) is at 4.4 ct kW−1 h−1 – which is almost equivalent to the SJ perovskite modules with no weight consideration from Fig. 3 – and only represents at best less than 2 ct kW−1 h−1 difference with c-Si PV. Based on the LCOE factor alone, tandem modules might thus not provide a better alternative than c-Si PV in the utility sector. Moreover, tandem modules are more complex to manufacture than SJ modules (from either c-Si or perovskite). However, the LCOE metric does not take into account certain external costs,68 such as those associated with land use, which will decrease with the use of more efficient solar modules. Tandem modules (and multi-junction modules in general) might therefore still prove critical in the utility sector, especially in places where land is scarce. We turn to the learning curve analysis to explore the potential for future cost reductions in tandem modules.
With CAPEXmodule at 337, 183, and 95 € per kWp in 2050, the scenarios for tandem modules yield similar values, albeit slightly higher, than those obtained for SJ perovskite modules. CAPEXBOS on the other hand are largely reduced, a consequence of the dramatic decrease in area-related costs for these better performing modules. Overall, from 2025 to 2050, CAPEXBOS reduces from 455 to 355 € per kWp in the conservative scenario, from 360 to 225 € per kWp in the baseline scenario, and from 275 to 140 € per kWp in the optimistic scenario. This significant reduction in CAPEXBOS helps to explain the beneficial LCOE trends obtained for tandem modules under the conservative and baseline scenarios, where the LCOE reduces from 13 to 8.5 ct kW−1 h−1, and from 9 to 5 ct kW−1 h−1 between 2025 and 2050. The optimistic scenario on the other hand starts at a slightly lower value of 6 ct kW−1 h−1 (compared to 6.5 ct kW−1 h−1 for the perovskite SJ modules) but reaches the same final LCOE of 2.8 ct kW−1 h−1 in 2050. Were the LCOE of c-Si PV to remain constant over this timeline, the year in which the LCOE of tandem modules would become equal to the LCOE of c-Si modules would be either 2035 or 2025, for the baseline and optimistic scenarios respectively – meaning tandem modules at 100 € per m2 showing 30% PCE and 1% ADR would already be cost-competitive with c-Si PV as early as 2025. As we assume that the LCOE of c-Si PV will in fact continue to decrease until 2050, the field for possible competition with c-Si PV is mostly reduced to the optimistic scenario conditions. It is therefore clear from this analysis that, firstly, the tandem modules only realise beneficial LCOE values if the assumption of a higher PCE is effectively reached, and, secondly, that it is the set of assumptions behind the optimistic scenario which allow for a competition with c-Si PV in the utility sector. Importantly, the lowest possible value for LCOE – here 2.8 ct kW−1 h−1 when Irr = 1200 kW h per m2 per year (see Fig. S4 and S5 of the ESI† for further analysis under lower and higher Irr conditions) – can be achieved interchangeably by either SJ modules or tandem modules. The future of perovskite PV thus crucially relies on technological developments in terms of efficiency and stability, but also scalability, of each of these types of perovskite technologies.
Footnote |
† Electronic supplementary information (ESI) available: Literature analysis datasets; module manufacturing cost as function of manufacturing plant location; module degradation and module replacement; CAPEX and OPEX datasets; assumption of BOS cost reduction for lighter modules; projected cost reduction scenarios for LCOE under low and high irradiation levels. See DOI: https://doi.org/10.1039/d3se00828b |
This journal is © The Royal Society of Chemistry 2023 |